Cryogenic Tank
Project: Mega Module of Gol Gohar
Client: Gol Gohar Iran and Steel Company (GISD)
Service: Liquid O2
Operating Temperature: -196/+50 °C
Operating Pressure: 17 barg
Capacity: 60 m3
Insulation: Perlite
Cryogenic Tank
Project: Mega Module of Gol Gohar
Client: Gol Gohar Iran and Steel Company (GISD)
Service: Liquid O2
Operating Temperature: -196/+50 °C
Operating Pressure: 17 barg
Capacity: 60 m3
Insulation: Perlite
Low Pressure Vaporizer
Project: Mega Module of Gol Gohar
Client: Gol Gohar Iran and Steel Company (GISD)
Service: Liquid O2
Operating Temperature: -196/+65 °C
Design Pressure: 40 barg
Design Flow Rate: 1000 Nm3/h
Cryogenic Tank
Project: Mega Module of Gol Gohar
Client: Gol Gohar Iran and Steel Company (GISD)
Service: Liquid N2
Operating Temperature: -196/+37 °C
Operating Pressure: 16 barg
Capacity: 60 m3
Insulation: Perlite
Cryogenic Tank
Project: Mega Module of Gol Gohar
Client: Gol Gohar Iran and Steel Company (GISD)
Service: Liquid N2
Operating Temperature: -196/+37 °C
Operating Pressure: 16 barg
Capacity: 50 m3
Insulation: Perlite
Cryogenic Tank
Project: Mega Module of Gol Gohar
Client: Gol Gohar Iran and Steel Company (GISD)
Service: Liquid N2
Operating Temperature: -196/+37 °C
Operating Pressure: 16 barg
Capacity: 50 and 60 m3
Insulation: Perlite
Ammonia Separator
Project: Mihan Factory Development
Client: Mihan Dairy & Ice Cream
Design Pressure: 20 barg
Capacity: 7 and 10 m3
Ammonia Separator
Project: Mihan Factory Development
Client: Mihan Dairy & Ice Cream
Design Pressure: 20 barg
Capacity: 7 and 10 m3
Ammonia Separator
Project: Mihan Factory Development
Client: Mihan Dairy & Ice Cream
Design Pressure: 20 barg
Capacity: 7 and 10 m3
Oil Separator
Project: Refrigeration Units of Mahya Protein
Client: Mahya Protein
Design Pressure: 21 barg
Capacity: 0.1 m3
Ammonia Separator
Project: Refrigeration Units of Mahya Protein
Client: Mahya Protein
Design Pressure: 18, 18 and 15 barg
Capacity: 10, 14 and 15 m3
Ammonia Receiver
Project: Refrigeration Units of Mahya Protein
Client: Mahya Protein
Design Pressure: 21 barg
Capacity: 4.1 m3
Liquid CO2 Storage Tank
Project: Development of the United Nations Industrial Organization
Client: United Nations Industrial Organization (UNIDO)
Design Pressure: 20 barg
Operating Temperature: -30 ºC
Insulation: Polyurethane
Capacity: 3.5 m3
Liquid CO2 Storage Tank
Project: Development of the United Nations Industrial Organization
Client: United Nations Industrial Organization (UNIDO)
Design Pressure: 20 barg
Operating Temperature: -30 ºC
Insulation: Polyurethane
Capacity: 3.5 m3
Liquid CO2 Storage Tank
Design Pressure: 22 barg
Operating Temperature: -30 ºC
Insulation: Polyurethane
Capacity: 25 m3
Liquid CO2 Storage Tank
LP Air Receiver
Project: Desalting Unit of Mansuri Oil Field
Client: Petroleum Engineering and Development Company
Design Pressure: 10.8 barg
Capacity: 48.8 m3
LP Air Receiver
Project: Desalting Unit of Mansuri Oil Field
Client: Petroleum Engineering and Development Company
Design Pressure: 10.8 barg
Capacity: 48.8 m3
LP Air Receiver
Project: Desalting Unit of Mansuri Oil Field
Client: Petroleum Engineering and Development Company
Design Pressure: 10.8 barg
Capacity: 48.8 m3
LP Air Receiver
Project: Desalting Unit of Mansuri Oil Field
Client: Petroleum Engineering and Development Company
Design Pressure: 10.8 barg
Capacity: 48.8 m3
LP Air Receiver
Project: Bandar Abbas Gas Condensate Refinery
Client: Persian Gulf Star Oil Co
Design Pressure: 11 barg
Capacity: 200.7 m3
LP Air Receiver
Project: Bandar Abbas Gas Condensate Refinery
Client: Persian Gulf Star Oil Co
Design Pressure: 11 barg
Capacity: 200.7 m3
Compressed Air Tank
Project: South Pars Gas Field – Phase 19
Client: National Iranian Oil Company (NIOC)
Design Pressure: 20 barg
Capacity: 0.2, 0.5, 1 and 2 m3
Compressed Air Tank
Project: South Pars Gas Field – Phase 19
Client: National Iranian Oil Company (NIOC)
Design Pressure: 20 barg
Capacity: 0.2, 0.5, 1 and 2 m3
Compressed Air Tank
Project: South Pars Gas Field – Phase 19
Client: National Iranian Oil Company (NIOC)
Design Pressure: 20 barg
Capacity: 0.2, 0.5, 1 and 2 m3
Deaerator
Project: Lavan Refinery Upgrading Unit
Client: Lavan Oil Refinery
Design Pressure: 3.5 barg
Capacity: 48 m3
Deaerator
Project: Lavan Refinery Upgrading Unit
Client: Lavan Oil Refinery
Design Pressure: 3.5 barg
Capacity: 48 m3
Deaerator
Project: Barez Tire Factory Development
Client: Barez Tire Manufactory
Design Pressure: 3 barg
Capacity: 15 m3
Deaerator
Project: Barez Tire Factory Development
Client: Barez Tire Manufactory
Design Pressure: 3 barg
Capacity: 15 m3
Hydraulic Oil Accumulator Tank
Project: Development of Esfarayen Steel Making Unit
Client: Esfarayen Industrial Complex (EICO)
Design Pressure: 16 barg
Capacity: 26 m3
Steam Accumulator Tank
Ammonia Accumulator Tank
Vertical Ammonia Accumulator Tank
Autoclave
Project: Digestion Process of Reclaiming Unit
Client: kavir Tire Co
Design Pressure: 16 barg
Capacity: 26 m3
Autoclave
Project: Digestion Process of Reclaiming Unit
Client: kavir Tire Co
Design Pressure: 16 barg
Capacity: 26 m3